成版人性直播视频app

Home > service and support > Installation and maintenance

Installation and maintenance

I. Industrial production, workshop room and warehouse environment, indoor whole humidification, general method introduction of large and medium-sized industrial humidifier equipment installation
 
1. Industrial humidification equipment installation and location selection
 
The installation location of the equipment can be selected from the following factors: 1) The maximum relative humidity of the required humidification environment. In the environment where humidification is required, when the maximum relative humidity is higher than 75% RH, the installation of the humidification equipment should be required. Outside the humidification environment; humidification equipment can be installed in a humidified environment when the maximum relative humidity is less than 75% RH. 2) Explosion-proof requirements for the required humidification environment; all explosion-proof requirements for the required humidification site, and installation of humidification equipment should be in the non-explosion-proof requirements area other than the required humidification environment. 3) If the Celsius temperature in the required humidification environment is below zero, the equipment shall be installed in a place where the Celsius temperature is higher than zero degrees outside the required humidification environment. 4) If there is more floating dust in the required humidification environment, which may cause the air intake of the equipment to work poorly, the equipment should be installed outside the required humidification environment.
 
After determining the installation location of the equipment according to the above conditions, the installation height of the equipment should also be considered. Under normal circumstances, the equipment fogging port should be set at the uppermost end of the humidification site, within 50CM from the top, and the fogging port should be reduced as far as possible to the vertical of the equipment. Distance, in order to maximize the efficiency of aerosol transmission, therefore, atomization humidification equipment should be considered as high as possible installation. After the installation location and installation height of the selected equipment, the fogging pipeline can be connected according to the specific conditions in the humidification site; first, if there is a high-speed airflow source in the humidification site, such as various high-speed fans, various gas injection ports, etc. At this time, the outlet port of the mist outlet should be disposed below the airflow source, and the outlet is upward, so that the high-speed airflow source can be uniformly vaporized and diffused; if the airflow is relatively stationary in the humidification site, it should be considered in the humidification site. The extension of the mist outlet pipe is extended to evenly distribute the mist port, and each of the mist branch ports is inclined at an angle of 30 degrees to the horizontal, so that the humidification water mist naturally floats and floats.
 
2. Precautions in the installation of industrial humidification equipment
 
The equipment should be installed horizontally. Externally connected PVC pipe fittings need to be sealed to prevent air leakage. When the external water supply pressure is insufficient, a pressurized water pump should be connected to make the water supply pressure greater than 1kg /cm 3 . The connection between the water inlet port and the water supply pipe of the equipment must be connected by a hose with a lock nut on both sides. Since the connection hose has a sealing ring inside the lock nut, the connection wire does not need to be wrapped around the wire to prevent water leakage. In a water supply pipeline, when connecting multiple equipments, the water supply branch line of each equipment must be connected to a water supply cut-off door for convenient maintenance and maintenance in the future. For the newly installed water supply pipeline, a certain amount of water should be discharged first, and the new installation pipeline should be cleaned to prevent the impurities in the new pipeline from clogging the water inlet solenoid valve, causing the water supply failure.
 
After the equipment is installed stably, the outflow line of the equipment can be sealed according to the pre-designed pipeline. When connecting, please pay attention to: set the flange connection plate at the near equipment point, or connect with the hose. This is in the future. The maintenance and maintenance of the equipment is convenient; in the pipeline connection, the distance from the proximal end of the equipment is relatively low, and the distance from the distal end of the equipment is relatively high. The lowest point of all the outlets of the pipeline should be higher than 1/3 of the diameter of the pipeline. In order to ensure that the accumulated water in the transmission pipeline is completely returned to the equipment, the pipeline is unblocked; in order to make the humidification space humid and evenly distributed, the pipeline can be connected to several fog outlets according to the actual situation, and the diameter of the outlet can be based on actual conditions. The situation is selected. The “U” shape is forbidden in the pipeline connection, because this connection will cause the pipeline to dew condensation and affect the normal operation of the equipment.
 
3, industrial humidifier first boot
 
After the equipment is installed stably, the power supply of the equipment should be allocated according to the power consumption on the equipment nameplate, and a certain power headroom should be left. The power supply is unidirectional 220V/50H, and there should be a good and reliable protective grounding wire to ensure the safety of the equipment. It is forbidden to open the cover of the electrical box at will. If you need to open the cover of the electrical cover, you should turn off the power and disconnect the power plug to ensure the safety of personnel and equipment.
 
In order to ensure that the equipment produces clean negative ion water mist and reduce the content of calcium and magnesium particles, it is recommended to use demineralized water or purified water, especially in food, printing, painting and other industries, as well as other static-containing occasions. Softened water or purified water. After connecting the water supply and power supply circuit, you can turn on the power switch, manually control the series equipment to start the water supply work, and start the spray work after reaching the specified water level. For program or automatic control of series equipment, the humidity sensor probe (sensor probe should be shockproof) should be installed in the humidifier to control the appropriate position of the humidity. Then fix the sensor cable and plug it into the humidity control socket of the device to set the controller. The device starts working. The specific setting method is detailed in the random manual.
成版人性直播视频apphttp://76814.com.cn/网站地图成版人性直播视频apphtml

随机关键词

:趁她睡着我慢慢进入,樱桃视频APP视频入口,雷丝透明裤衩美女图片,56炮视频app下载安装,富二代特色短视频网站,长篇儿子与母亲乱小说,合欢视频下载安装污,炮炮视频最新版,大团结孙倩全文阅读,柠檬视频直播app,阿宾小说阅读全文79章,青柠檬视频,日本免费一二三区小优视频,欲艳春媚荡吟全文阅读,荔枝视频黄片

最新更新内容随机展示


qgfyru521.cn|nanyaro.net本田凌派锐·混动终于来了 动力油耗兼顾了解下【双语汇】new COVID-19 words新冠新语全国政协外事委员会副主任孔泉“噪声”不解决问题 防疫需要全球的努力卫兴华:怀安邦兴国志 治经世济民学“神车”光环能否保留 测试大众途观丝绸之路版改革开放40年—半月谈网(COVID-19) La communauté internationale en appelle à la solidarité et rejette la stigmatisation face à la pandémie在“最好的阶段” 胡军踏实做演员江苏出台重磅方案打造高水平的“创新矩阵”,苏南五市创新发展的定位布局定了!新闻中心中国常州网 常州第一门户网 常州龙网 常州日报 常州晚报敏感时期东风41亮剑有何玄机 反制美俄加强核武表态东风41核武器导弹国产电影突围,期待更多“战狼”新华大数据今天的数据,也太好哭了吧不求“官”有多大,但求无愧于民专家:全国工商联助推民营经济健康持续高质量发展一位西方人对杜甫的致敬